It depends on the block. A realistic all-in range in NSW for a fully turnkey dual occupancy build is wide, because block size, slope, council contributions and inclusions levels all swing the number significantly. Rather than quote a headline number, this page breaks the cost down into the pieces that actually drive it.
What sits inside a dual occupancy build cost
Base build
Materials, labour, structural elements, fixtures, finishes. This is the number most quotes lead with.
Site costs
Excavation, soil classification, retaining walls, drainage, stormwater, surface water pits. The single biggest source of budget blowouts when underestimated.
Council and developer contributions
Section 7.11 or 7.12 payments, developer contributions, infrastructure charges. Highly council-specific.
Design and approvals
DA or CDC, architectural and engineering work, BASIX, landscape plans.
External works
Driveway, fencing, landscaping, alfresco, clothesline, letterbox, retaining.
Services and utilities
Sewer, water, power, gas, NBN. Sometimes requires upgrades.
Subdivision
Only if you’re separating onto two titles – surveys, plans, registrations.
What drives the price up
- Steeply sloping blocks (significant excavation and retaining)
- Reactive or rocky soils
- Heritage or bushfire overlays
- Councils with high section 7.11 contributions
- Larger or higher-spec dwellings
- Full Torrens subdivision at completion
What Velson’s turnkey price includes
Everything above. Not a list of add-ons quoted separately after you’ve committed – the complete delivered price on day one.